Interior

Baths

Primary suites, wet rooms, and powder rooms — engineered dry.

A bathroom either holds water for decades or fails in two years. We build them the first way. Our bath construction is structural — full-mortar-bed setting, pre-sloped linear drains, sheet-membrane waterproofing, honed slab jointery — not the glue-and-pray install that fills Miami complaint forums.

01 · Approach

Our Approach

Design starts with how you actually begin the day. Volume of water, light temperature, the temperature of stone under your feet. Then it becomes construction: we detail every transition, every threshold, every shower-slope-to-drain ratio. No surface in an Elygance bath is there by accident.

02 · What We Build

What we build.

01

Primary suite spa baths

Steam, rain, soaker, linear drain, heated stone.

02

Wet rooms and curbless showers

Full-bathroom waterproofing, ADA-friendly, modern silhouette.

03

Stone slab selection — Calacatta, Taj Mahal, Patagonia quartzite

Book-matched, sourced at the yard, numbered at cut.

04

Powder rooms as design statements

Small rooms get the most attention — they're the ones guests photograph.

05

Bal Harbour and Surfside bathroom remodels

Coastal-code waterproofing + HOA quiet-hours compliance.

30 days Price signed on paper
3 counties Miami-Dade · Broward · Palm Beach
1 firm From drawing to keys

03 · Frequently Asked

Frequently asked.

What waterproofing do you use?

Schluter-Kerdi sheet membrane over pre-sloped mortar bed, with a 5-year watertight warranty from us beyond the manufacturer's. We install it ourselves — not a subcontractor on a Friday afternoon.

How long does a full primary bath take?

10 to 14 weeks from demolition to final seal, longer if stone is custom-sourced from Italy or Brazil.

Can you work with wall-hung plumbing in an older building?

Yes. We often reconfigure plumbing rough-ins, relocate drains, and coordinate with building management on slab penetrations and COI requirements.

Do you handle the glass and custom shower doors?

Yes — we template, fabricate, and install as part of the contract. No coordination gap between trades.

Is radiant floor heating worth it in Miami?

For primary baths on stone or porcelain — yes. It takes the chill off winter mornings without conditioning the whole house. Cost is modest if we specify it during rough-in.

Begin a conversation

Start a conversation

A short note tells us everything we need to schedule a first call.

Begin a project